Accueil >  Term: plant hours connected to load
plant hours connected to load

The number of hours the plant is synchronized to load over a time interval usually of 1 year.

0 0

Créateur

  • Pud6
  •  (Gold) 2324 points
  • 100% positive feedback
© 2025 CSOFT International, Ltd.