Accueil >  Term: program acquisition cost
program acquisition cost

The estimated cost of development (RDT&E), procurement, and system specific military construction (MILCON) necessary to acquire the defense system. RDT&E costs shall be accumulated from the point in time when the DoD acquisition program is designated by title as a program element or major project within a program element. MILCON costs shall include only those projects that directly support and uniquely identify with the system.

0 0

Créateur

  • mf1967
  • (Oklahoma, United States of America)

  •  (Gold) 1564 points
  • 100% positive feedback
© 2024 CSOFT International, Ltd.