Accueil > Term: test and control
test and control
The ISTC Test and Control provides the human interface for testing system hardware and software. The Test and Control will consist of the necessary consoles, processors, and storage devices in order to be able to control all operations of the ISTC such as configuring the system, running a scenario, analyzing data, generating reports, and testing system hardware and software.
- Partie du discours : noun
- Secteur d’activité/Domaine : Militaire
- Catégorie : Missile defense
- Company: U.S. DOD
0
Créateur
- mf1967
- 100% positive feedback
(Oklahoma, United States of America)